Lines Matching full:smaller
89 then, if the scheduling deadline is smaller than the current time, or
353 If, instead, the total utilization is smaller than M, then non real-time
360 maximum tardiness of each task is smaller or equal than
376 of the tasks running on such a CPU is smaller or equal than 1.
380 running on such a CPU is smaller or equal than 1:
401 such a time with the interval size t. If h(t) is smaller than t (that is,
403 smaller than the size of the interval) for all the possible values of t, then
426 period smaller than the one of the first task. Hence, if all the tasks
429 smaller than the absolute deadline of Task_1, which is t + P). As a
452 As seen, enforcing that the total utilization is smaller than M does not
455 a total utilization smaller than M is enough to guarantee that non real-time
460 the total utilization is smaller or equal than M then the response times of
560 is smaller than M. When talking about -deadline tasks, this requires that
561 the sum of the ratio between runtime and period for all tasks is smaller
670 -deadline tasks cannot have an affinity mask smaller that the entire