Lines Matching refs:smaller
89 then, if the scheduling deadline is smaller than the current time, or
347 If, instead, the total utilization is smaller than M, then non real-time
354 maximum tardiness of each task is smaller or equal than
368 of the tasks running on such a CPU is smaller or equal than 1.
372 running on such a CPU is smaller or equal than 1:
389 such a time with the interval size t. If h(t) is smaller than t (that is,
391 smaller than the size of the interval) for all the possible values of t, then
414 period smaller than the one of the first task. Hence, if all the tasks
417 smaller than the absolute deadline of Task_1, which is t + P). As a
438 As seen, enforcing that the total utilization is smaller than M does not
441 a total utilization smaller than M is enough to guarantee that non real-time
446 the total utilization is smaller or equal than M then the response times of
545 is smaller than M. When talking about -deadline tasks, this requires that
546 the sum of the ratio between runtime and period for all tasks is smaller
653 -deadline tasks cannot have an affinity mask smaller that the entire